QuantWeftYuxiao Ma
中文
On this page

    Project 5 Gap Table

    These are gaps in the A5 screening-preparation layer, not claims that the later c5/ALIGN constructed implementation is missing. Real-data, rights, and point-in-time gaps remain; a constructed implementation does not close them.

    Missing item Impact Treatment in this layer Who must supply it
    Security-level adjusted prices (including corporate actions) Real pair screening and backtesting cannot be performed Demonstrate with aggregated French industry portfolios; label them non-tradable User supplies or authorizes a data source
    Historical universe and delistings Survivorship bias No securities are used, so this is not addressed; no claim of unbiased results Same
    Borrow availability, fee, and recall Cost and feasibility of the short leg Not implemented; listed under not_included Same
    Two-leg cost convention Net returns Not implemented Same
    available_at (data-availability time) Point-in-time validity Not available for French data; declared non-point-in-time Cannot be supplied
    Entry/exit, risk controls, trading lag, flat-position state Strategy layer Not implemented (required by the contract) Complete Project 5 phase
    Multiple out-of-sample walk-forward windows Robustness Gives only “post-training-window diagnostics” for two windows; does not evaluate walk-forward performance Complete Project 5 phase
    Structural-break and cointegration-breakdown tests Failure windows Describes only frozen-spread half-life and ADF; no breakpoint test Complete Project 5 phase
    Diagnostics when the subsequent window contains missing values Frozen-spread ADF and half-life require a complete monthly series Validate screening and the subsequent window separately. The training segment must include train_end; the subsequent window must contain exactly every month from the month after train_end through test_end, once each. Missing months, missing endpoints, duplicates, an empty window, NaN, or infinity raise an error; no imputation or time compression is used. Data after test_end is not included in validation. The complete Project 5 phase must decide the real-data missingness rule; the preparation layer rejects incomplete input

    Search the course

    Enter a search term.