QuantWeftYuxiao Ma
中文
On this page

    Project 4 Gap Table

    Missing input Consequence Signal-layer treatment Responsibility
    Company-level PIT fundamentals, restatements, accepted, and prior-year comparatives No real value/quality signals Constructed universe; see source_feasibility.md for the historical SEC-document reading scope. Tag mapping, time zones, and annual-value filtering remain unchecked User-supplied data or separately authorized download, followed by verification
    Security prices, total returns, delisting returns, corporate actions No real momentum or labels Constructed returns; −25% delisting-month return is an assumption User-supplied or authorized source
    Historical universe and constituent changes Survivorship bias Constructed as-of membership; no claim of a real universe Same
    Historical market cap and shares outstanding Value ratios and size neutralization Constructed month-end cap Same
    Historical industry classifications PIT neutralization Constructed static labels; SEC sic is filing-specific Same
    Daily prices and trading calendar Next-tradable-time execution of closing signals Monthly approximation, differing by up to one trading session; see rule 6 in pit_event_graph.md Same
    Beta and market data Beta/exposure checks Not implemented here; industry/size exposures only Complete-project stage
    Costs, borrowing/financing, capacity Net returns Absent from this signal layer; separate constructed cost/execution teaching does not establish real borrowing or capacity Complete-project stage
    Walk-forward, factor ablation, robustness, report Complete project Absent here; historical constructed ledger/cost reports exist, with replay distinct from new computation Complete-project stage
    Data rights and licenses Permitted use/redistribution No restricted data downloaded User confirmation
    Minority interest, preferred stock, nonoperating assets in EV Real-company EV/EBITDA would not reconcile with Chapter 24; discrepancy depends on missing items versions lacks these fields; zero is an explicit constructed-universe assumption only Add and reconcile at the real-data stage

    This is a table of real signal-input gaps. It does not deny the existing constructed ledger and cost teaching. Listed-support projection is corrected under the current C13 protocol; real security-level data, trading eligibility, financing, and borrowing gaps remain.

    Search the course

    Enter a search term.