Scope of market evidence
The default route is offline. French raw, extracted and processed data are not bundled. G01’s actual legal entity, purpose and rights remain unknown; G05 has not authorized A10-B. A10-A has limited design acceptance and A10-A.1 technical protocol acceptance, neither market-execution permission. Public availability does not establish research-use or redistribution rights. Do not download market data to run these Notebooks or label constructed replacements as missing historical market inputs.
Historical acceptance of Projects 1–3 binds its original version and scope, not stock-level PIT or tradability. Projects 4–6 retain their recorded market-research blocks and evidence gaps; constructed method checks cannot close them. Chapter 39’s historical row predictions and common-date paired evidence remain missing, without fabrication or retraining. Fixed summaries and figures replay their original records rather than new verification. Retain all negative and zero results; unknown or blocked does not mean a zero effect.
The Capstone supplies accepted research questions, timing contracts, protocol, dictionary and 18 report guides, plus fixed two-asset offline engineering. Its French monthly configuration is parameter teaching only; the market adapter is unimplemented and target market research/results have not been produced. Engineering PASS does not answer the target net-mean hypothesis. Exposed history cannot become a blind holdout again; historical availability, ingestion and revision clocks remain unknown.